WASHINGTON DC PERMIT SUBMITTAL CHECKLIST (ACCELERATED PLAN REVIEW) ================================================================== DC Department of Buildings accelerated plan review accepts only a 100% complete drawing set on the day of upload. This checklist covers floor plans, elevations, sections, seals, and the District submission checklist required with the package. Sources checked 2026-11-17 https://vssq.com/checklists/permit-submittal-washington-dc ------------------------------------------------------------------------------ 10 ITEMS ------------------------------------------------------------------------------ 1. Complete construction drawing set your team · required · start 60 days before Missing: The package is not a submittal, and the review clock never starts. 3 separate documents: - Floor plans - Elevations - Detailed sections The sheet most often missing, and the one that triggers a return rather than a comment. 2. The jurisdiction's own completeness checklist, filled in and uploaded your team · required · start 20 days before Missing: A complete set can still be refused as an incomplete submittal because the checklist was not attached. 3. Structural, mechanical, electrical and plumbing drawings your team · if applicable · start 45 days before Missing: Trade permits cannot be issued, and later submittals may be billed or returned. 4. Professional seals or stamps in the form the jurisdiction accepts your team · required · start 30 days before Missing: Unsealed drawings are treated as inadequate and are not reviewed. 5. Planning, zoning or land-use approval, where the project needs it third party · if applicable · start 120 days before Missing: The building permit cannot be issued ahead of the land-use decision. 6. Site plan, grading and stormwater documents your team · if applicable · start 45 days before Missing: The submittal is returned for a missing discipline rather than reviewed with comments. 7. Energy code compliance documentation your team · if applicable · start 30 days before Missing: Code review stops at the energy chapter. 8. Owner or contractor authorisation and the application form client · required · start 30 days before Missing: The applicant is not established and the application is not accepted. 9. Fees paid at the rate the jurisdiction applies client · required · start 10 days before Missing: The clock does not start until payment clears. 10. Deferred submittal list, where any portion is deferred your team · if applicable · start 20 days before Missing: A deferred scope that the jurisdiction does not accept sinks the whole application. ------------------------------------------------------------------------------ COMPLETE MEANS COMPLETE ON THE DAY OF UPLOAD A hundred-percent set means every sheet the project needs, not every sheet currently drawn. A package submitted with a note that sections are to follow is not a partial expedited submittal; it is an incomplete one, and the accelerated route does not apply to it. THE JURISDICTION'S CHECKLIST IS PART OF THE PACKAGE The District requires a fully completed submission checklist in the application package. It is one page, it costs nothing, and it is the row that most often separates a package that gets reviewed from one that gets sent back. COMPLIANCE DOES NOT GET RELAXED FOR SPEED Accelerated review changes when the review happens, not what the review checks. Code compliance remains the standard, so compressing the schedule by submitting early with unresolved code questions moves the problem rather than solving it. ------------------------------------------------------------------------------ SOURCES - DC Department of Buildings — Accelerated Plan Review Program https://dob.dc.gov/page/accelerated-plan-review-program - DC Department of Buildings — permitting https://dob.dc.gov ------------------------------------------------------------------------------ A starting point, not legal advice. Confirm every item against the current form instructions and the rules for your matter. VSSQ — the same list, with an owner and a client link for each row. https://vssq.com/sample