Proof of loss checklist (first-party property claim)
A first-party claim is decided on a form and supported by a file. The form is one page signed under oath; the file is what makes the number in it defensible. Most of the value is lost before the form is drafted, in an inventory built from memory.
Sources checked 2026-11-17
Want a quick estimate first? Try the Proof-of-loss clock, or start free for Insurance: track every item, who owes it, when to start, and a completeness check before anyone signs. Build free — pay only when you sign off.
| # | Item | Who provides it | Needed? | If it's missing |
|---|---|---|---|---|
| 1 | The policy and every endorsement in force at the date of loss | Client | Required | Coverage, sublimits and exclusions are unknown, and the claim is prepared against the wrong contract. |
| 2 | Sworn proof of loss, signed and dated | Client | Required | The claim is not perfected and the carrier's clock is not satisfied. |
| 3 | Inventory of damaged property with support
| Client | Required | The amount claimed is unsubstantiated and every line becomes negotiable. |
| 4 | Photographs and video of the damage | Client | Required | The extent of the loss is described only in words. |
| 5 | Evidence of the date and cause of loss
| Third party | Required | Whether the loss is covered at all cannot be established. |
| 6 | Contractor estimates and scope of repairs | Third party | If applicable | Repair cost is asserted rather than priced. |
| 7 | Mitigation invoices and evidence the property was protected | Client | If applicable | A policy duty goes undocumented and the recovery for it is disputed. |
| 8 | Mortgagee information and any lender requirements | Client | If applicable | Payment is delayed because a named loss payee was not addressed. |
| 9 | Prior claims history and correspondence with the carrier | Client | If applicable | The record of what was reported and when is reconstructed from memory. |
| 10 | Business interruption records, where claimed | Client | If applicable | Lost income is claimed without the financial records that support it. |
Download this checklist as a PDF — 10 items, who owns each one, its start-by date, and what happens if it is missing. No email needed.
When to start each item
An example schedule, counted back from the due date. Confirm the rules for your matter before you treat any date as safe.
- The policy and every endorsement in force at the date of loss — start 30 days before the due date
- Sworn proof of loss, signed and dated — start 10 days before the due date
- Inventory of damaged property with support — start 30 days before the due date
- Photographs and video of the damage — start 10 days before the due date
- Evidence of the date and cause of loss — start 15 days before the due date
- Contractor estimates and scope of repairs — start 30 days before the due date
- Mitigation invoices and evidence the property was protected — start 10 days before the due date
- Mortgagee information and any lender requirements — start 15 days before the due date
- Prior claims history and correspondence with the carrier — start 15 days before the due date
- Business interruption records, where claimed — start 30 days before the due date
The policy defines the file
Coverage, deductibles, sublimits, and the duties after loss all come from the policy and its endorsements, not from the claim form. Building an inventory before reading the endorsements produces a claim for things that are excluded, which weakens the parts that are covered.
The inventory is the claim
Item, quantity, age, replacement cost, and support. A line item with no receipt, photograph or model number is a negotiation, not a valuation. Photographs taken before the loss are worth more than any taken after it, which is why this row is the one that depends on the client having done something years earlier.
Duties after loss run on a clock
Notice, protection of the property from further damage, records, and the sworn proof itself all have policy conditions attached. Mitigation invoices are both a cost to recover and evidence that the duty was performed.
Same checklist rows, with an owner and a start-by date on each one. Or open the client-side sample first — nothing to install.
Related: All package checklists, The client-side sample
Keep reading
FAQ
- Does the sworn proof of loss have to be filed before the inventory is finished?
- No — finish the inventory before signing the sworn proof of loss. The policy sets the proof deadline, but the inventory supports the dollar amounts, and revising a sworn proof after signing is harder than getting the inventory right first.
- What if the client has no receipts?
- Yes — support the inventory without receipts using photographs, bank or card statements, model and serial numbers, warranty registrations, or replacement cost of a comparable item. The file must show a basis for the number, not necessarily a receipt.
- Why do mitigation invoices matter beyond the money?
- They document a policy duty to protect the property from further damage, not only an optional expense. The invoice is both a recoverable cost and evidence that the duty was performed.