Case file · Audit & assurance
The PBC item that comes from the bank, not the client
A PBC list is not a to-do list for the client. Three items on it are controlled by someone who has never heard of your deadline.
Sources checked 2026-11-08Reconstruction from the public record — no client named, none quoted
Not a client story. A failure shape: a fieldwork start date, a PBC list, and the confirmations that must come back from a third party to be worth anything.
- Rows on the list
- 140
- Rows that are third-party
- 5
- Time to get a confirmation back
- 2–4 weeks
- Slip
- 12 days
All of them on the critical path
Typical bank turnaround
On a fieldwork date that was set in a contract
How it went
- T − 45
PBC list sent as a spreadsheet. 140 rows. Two columns are named 'client' and 'auditor'. Neither column has a person in it.
- T − 30
120 rows in. The list is called 'basically done' on the status call.
- T − 21
Someone remembers the bank confirmations have to be mailed by the bank, not forwarded by the client. Requests go out today.
- T − 7
Two of five confirmations back. Fieldwork starts anyway, on a sample that cannot be completed.
- T + 12
Last confirmation arrives. The audit report is late, and the client's lender asks why.
Where a check turns red
Same file, four moments earlier — with an item list that has an owner and a date on every row.
Third-party flag
Confirmation letters, legal letters, and custodian statements are marked as third-party items with their own lead time — not as client uploads.
What would stop sign-off: Counting a client-forwarded confirmation as received.
Ready-for-fieldwork
The check requires the third-party items to be accepted, not merely requested, before the package can be called ready.
What would stop sign-off: Declaring readiness on a percentage while the long-pole items are open.
Who owes it
Every row has a name. 'Client' is not a person, and a row with no person is a row nobody is chasing.
What would stop sign-off: The status meeting where 120 of 140 sounds like progress.
What to do on Monday
- Sort the PBC list by who controls the item before you sort it by account. Third-party items go out first.
- Replace the word 'client' with a person's name and email in every row. A row with no name will be the one that's late.
- Never call a package ready at 90% when the missing 10% is the part you cannot produce yourself.
Related: PBC evidence pack checklist, PBC readiness tool, Audit practice area
FAQ
- Why can't the client just forward the bank confirmation?
- Because the point of the confirmation is that it came from the bank. A document that passed through the client is weaker evidence, and most auditors will not treat it as a substitute for a direct reply.
- How early should confirmation requests go out?
- Early enough that a non-response still leaves time to chase and re-send. Two to four weeks is common; assume the slow end for anything involving a custodian or a foreign bank.
Sources
This page is based on the sources below. Check the current official source before you rely on a date or a fee.
- AICPA — audit evidence and external confirmations — Confirmations are evidence because of the source, not the document.