VSSQ

Case file · Insurance claims

The claim that was filed on time and still barred

Two dates govern a property claim, and only one of them is on the calendar: when the loss happened, and when the signed proof of loss is due.

Sources checked 2026-11-08Reconstruction from the public record — no client named, none quoted

Not a client story. A failure shape: a 60-day proof-of-loss window, a document that must be sworn, and a contractor's estimate that arrives after the window it was meant to support.

Proof-of-loss window
60 days

Standard flood form; check the policy

Items the client must sign
1

Under oath, in most forms

Contractor estimate lead time
2–3 weeks

It sets the number in the form

What closes at the window
The claim

Not the damage

How it went

  1. Day 0

    Loss occurs. The policy's proof-of-loss window starts — commonly 60 days under the standard flood form, and often a shorter or contract-specific period elsewhere.

  2. Day 4

    Claim reported. Everyone agrees it was reported promptly, which feels like the deadline was met.

  3. Day 18

    Adjuster visits. The proof-of-loss form is mentioned as 'the form we'll need'. Nobody opens it.

  4. Day 40

    Contractor's estimate requested. It is the number the proof of loss has to state, and it takes three weeks.

  5. Day 58

    Estimate arrives. The form needs the policyholder's signature, notarised in some policies, plus receipts and a depreciation schedule.

  6. Day 60

    Form submitted incomplete — no depreciation schedule. Insurer requests a complete proof of loss; the window has closed once already.

Where a check turns red

Same file, four moments earlier — with an item list that has an owner and a date on every row.

Two clocks

The notice and the proof of loss are separate deadlines with separate evidence. The package tracks both rather than the earlier of the two.

What would stop sign-off: Treating 'claim filed' as the only date that matters.

Signature and oath

The item is a client-signed document. It cannot be completed by the firm, and it cannot be released without the signature.

What would stop sign-off: Sending an unsigned or unnotarised proof of loss out as complete.

The number

The stated amount depends on the estimate and the depreciation schedule. Change one, the other is stale.

What would stop sign-off: A proof of loss whose figures do not match the attached estimate.

What to do on Monday

  • Open the proof-of-loss form the day the claim is reported — not the day the adjuster mentions it.
  • Order the estimate before the form is drafted, because the form cannot be finished without a number.
  • Calendar the client's signature as its own item with its own date. It is the one thing your team cannot do for them.

Related: Claims evidence pack, Proof-of-loss clock, Insurance claims practice area

FAQ

Is the proof-of-loss deadline always 60 days?
No. 60 days is the window in the standard flood policy; other policies and endorsements set their own periods, and some states impose claim-handling rules on top. The policy language controls.
What happens if the proof of loss is late?
The insurer may deny the claim for failure to comply with a condition of the policy, and the burden shifts to the policyholder to explain the delay. It is the most common way a valid claim is lost.

Sources

This page is based on the sources below. Check the current official source before you rely on a date or a fee.

  1. FEMA — Standard Flood Insurance Policy, proof of loss — The proof of loss is a sworn statement with a stated amount, due within the policy's window.