Checklist
Madera CA permit submittal checklist (residential completeness)
Madera returns incomplete residential permit submittals without a plan check, so the review clock never starts. This checklist follows the City completeness requirements—full drawing set, seals, and no deferred submittals on the same application.
Sources checked 2026-11-17
Want a quick estimate first? Try the Permit pack, or start free for Permits: track every item, who owes it, when to start, and a completeness check before anyone signs. Build free — pay only when you sign off.
| # | Item | Who provides it | Needed? | If it's missing |
|---|---|---|---|---|
| 1 | Complete construction drawing set
| Your team | Required | The package is not a submittal, and the review clock never starts. |
| 2 | The jurisdiction's own completeness checklist, filled in and uploaded | Your team | Required | A complete set can still be refused as an incomplete submittal because the checklist was not attached. |
| 3 | Structural, mechanical, electrical and plumbing drawings | Your team | If applicable | Trade permits cannot be issued, and later submittals may be billed or returned. |
| 4 | Professional seals or stamps in the form the jurisdiction accepts | Your team | Required | Unsealed drawings are treated as inadequate and are not reviewed. |
| 5 | Planning, zoning or land-use approval, where the project needs it | Third party | If applicable | The building permit cannot be issued ahead of the land-use decision. |
| 6 | Site plan, grading and stormwater documents | Your team | If applicable | The submittal is returned for a missing discipline rather than reviewed with comments. |
| 7 | Energy code compliance documentation | Your team | If applicable | Code review stops at the energy chapter. |
| 8 | Owner or contractor authorisation and the application form | Client | Required | The applicant is not established and the application is not accepted. |
| 9 | Fees paid at the rate the jurisdiction applies | Client | Required | The clock does not start until payment clears. |
| 10 | Deferred submittal list, where any portion is deferred | Your team | If applicable | A deferred scope that the jurisdiction does not accept sinks the whole application. |
Download this checklist as a PDF — 10 items, who owns each one, its start-by date, and what happens if it is missing. No email needed.
When to start each item
An example schedule, counted back from the due date. Confirm the rules for your matter before you treat any date as safe.
- Complete construction drawing set — start 60 days before the due date
- The jurisdiction's own completeness checklist, filled in and uploaded — start 20 days before the due date
- Structural, mechanical, electrical and plumbing drawings — start 45 days before the due date
- Professional seals or stamps in the form the jurisdiction accepts — start 30 days before the due date
- Planning, zoning or land-use approval, where the project needs it — start 120 days before the due date
- Site plan, grading and stormwater documents — start 45 days before the due date
- Energy code compliance documentation — start 30 days before the due date
- Owner or contractor authorisation and the application form — start 30 days before the due date
- Fees paid at the rate the jurisdiction applies — start 10 days before the due date
- Deferred submittal list, where any portion is deferred — start 20 days before the due date
A return is worse than a correction
A correction is the review doing its job. A return means the package was never reviewed, and the time spent assembling it is gone. That is why the completeness checklist is worth more attention than any individual sheet: it is the document that decides whether the set is looked at.
No deferred submittals
Where the jurisdiction does not allow deferred submittals, anything not in the package cannot arrive later under the same application. A project that is not fully documented is not an incomplete application; it is a project that has to wait.
Stamps have their own rule
The checklist distinguishes the initial submittal from resubmittals on seals: unsigned stamps may be accepted on an initial submittal, while signed stamps are required on resubmittal. That is exactly the kind of detail a firm discovers after the fact.
Same checklist rows, with an owner and a start-by date on each one. Or open the client-side sample first — nothing to install.
Related: Washington DC permit submittal checklist (accelerated plan review), All package checklists, The client-side sample
Keep reading
FAQ
- What happens if the package is incomplete?
- The city returns it without a full plan check. Review has not started, so the project loses the time spent preparing the submittal rather than receiving comments it could respond to.
- Are unsigned stamps acceptable?
- Yes on an initial submittal when the plans are otherwise adequate; signed stamps are required on resubmittal. Confirm the current version of the checklist before relying on either.
- Can a deferred portion be added later?
- No—not on the same application where deferred submittals are not accepted. The scope has to be complete at submittal, which turns this into a scheduling decision rather than a paperwork one.